Master Specifications
- Section 503: Temporary Pavement Restoration (PDF, 84KB)
- Section 801: Excavation, Backfilling, and Compaction for Sanitary Sewers (PDF, 161KB)
- Section 802: Gravity Sewer Pipe (PDF, 70KB)
- Section 803: Sewer Manholes (PDF, 77KB)
- Section 804: Sewer Force Mains (PDF, 118KB)
- Section 805: Submersible Wastewater Pump Station (PDF, 268KB)
- Section 806: Manhole Rehabilitation (PDF, 137KB)
- Section 807: Pump Station Rehabilitation (PDF, 54KB)
- Section 808: Cured-In-Place-Pipe (CIPP) (PDF, 127KB)
- Section 809: Cured-In-Place-Pipe(CIPP) Laterals (PDF, 79KB)
- Section 810: Slip Lining (PDF, 99KB)
- Section 811: Pipe Bursting (PDF, 87KB)
- Section 812: Sewer Line, Manhole and Wet Well Cleaning (PDF, 55KB)
- Section 813: Sewer Flow Control (PDF, 51KB)
- Section 814: Smoke Testing (PDF, 32KB)
- Section 815: Sewer Line, Manhole, and Wet Well Inspection (PDF, 73KB)
- Section 816: Dye-Water flooding (PDF, 31KB)
- Section 817: Jacked and Bored Pipe/Casing (PDF, 66KB)
- Section 818: Horizontal Directional Drilling for Sewers (PDF, 103KB)
- Section 819: Microtunneling and Pipe-Jacked Tunnels (PDF, 221KB)
- Section 820: Pump Station Demolition and Site Restoration (PDF, 56KB)
- Section 821: Miscellaneous Work and Cleanup (PDF, 33KB)
- Section 822: Protective Coating (PDF, 221KB)