City of Baton Rouge / Parish of East Baton Rouge
City of Baton Rouge / Parish of East Baton Rouge dot
Click for Department of Public Works Information
Click for RFQ Manager Application
dot
Click for Wastewater Program Information
dot
Click items below for Transportation Information
Click for Green Light Program Information
Click for Baton Rouge Loop Program Information
dot
Click for Drainage & Bridges Program Information
Click for Buildings Program Information
Click for Standard Plans


SSO Program Home Page
General Program Information

Public Information

Construction

Consultant/Contractor Information

Contact Information
 
Regulatory Information:

The Consent Decree between the City of Baton Rouge/East Baton Rouge Parish (C-P), the U.S. Environmental Protection Agency (EPA), and the State of Louisiana was entered into in 1988. Since that time, terms have been refined and negotiated and were updated in the 2002 Consent Decree. The 2002 Consent Decree takes the place of the original document. However an “Agreement and Order Regarding the Modification of the Consent Decree" was lodged in late 2008 and then was approved by the EPA, State of Louisiana, and the Department of Justice (DOJ) in early 2009. The 2009 Consent Decree Modification includes additional provisions to the terms of the 2002 Consent Decree. The 2009 Consent Decree Modification adopts the C-P September 2008 Second Remedial Measures Action Plan (RMAP2) which includes comprehensive rehabilitation projects, capacity improvement projects, and wastewater treatment and storage improvement projects. In addition, there are some specific projects associated with the consolidation of the Central and South Wastewater Treatment Plants that are also a part of the plan. These projects are expected to improve efficiencies, and position the C-P for millions of dollars in fiscal savings through the 25-year planning period. The C-P is currently following both the 2002 Consent Decree and the 2009 Consent Decree modification.

Periodically the Baton Rouge City/Parish Department of Public Works posts regulatory resources and deliverables associated with the 2002 Consent Decree and the 2009 Consent Decree Modification in the Public Regulatory Document Repository.

For more information, a complete copy of both documents can be accessed by clicking on the links below:

Public Regulatory Document Repository:

Below is a list of public regulatory documents currently available.

Other Consent Decree Related Documents:

  1. Response to Public Comments: February, 2009 (PDF, 8.17MB)
  2. Lodging Notice Consent Decree: December 2008 (PDF, 5.92MB)
  3. RMAP2 Action Plan: September 2008 (PDF, 4.90MB)
  4. CWWTP Consolidation: July 2008 (PDF, 143KB)
  5. EPA Prioritization Summary: April 2008 (PDF, 2.83MB)
  6. RMAP1 Status Report: December 2007 (PDF, 1.20MB)
  7. IAP Status Report: October 2007 (PDF, 1.67MB)
  8. Approval Letter for RMAP2 from EPA and LDEQ to C-P: July 2007 (PDF, 880KB)
  9. TM for EPA on South WWTP: January 2007 (PDF, 172KB)
  10. Revised Draft Report to EPA CH2M HILL: November 2006 (PDF, 3.30MB)
  11. Draft Report to EPA-CDM: August 2005 (PDF, 3.38MB)